02/02/17 – Just an inch to the left. 

The main job for today was to install a brand new Mono pump that is used to transfer sludge to the holding tanks . 

The pump was a long cylindrical Shape And consisted of a rotating shaft which moves the liquid along the pump . Unfortunately the pump was left outside of the pump building and it needed to be manually lifted into position on a concrete platform so that it could be conected to the pipe work. it took along time to align all of the pipeline and make sure it connected correctly. 

Dan 